Starting burner for a fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11233255
APP PUB NO 20190379071A1
SERIAL NO

16484842

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention concerns a starting burner (100a; 100b) for a fuel cell system (1000a; 1000b), having a catalyst (10) with a catalyst inlet (11) and a catalyst outlet (12), a catalyst area (13) being formed between the catalyst inlet (11) and the catalyst outlet (12), and the catalyst area (13) being surrounded by a catalyst wall (14) in a passage direction (D) from the catalyst inlet (11) to the catalyst outlet (12), and an operating fluid guide section (20) for supplying an operating fluid (F1) to the catalyst inlet (11), wherein the operating fluid guide section (20) is arranged outside the catalyst (10) at least in sections along the catalyst wall (14). The invention also concerns a fuel cell system (1000) with the starting burner (100a; 100b) and a method for heating a service fluid (F1) in the fuel cell system (1000a; 1000b).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTDKANAGAWA 221-0023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Krauss, Thomas Graz, AT 21 174
Lawlor, Vincent Graz, AT 6 7
Makinson, Julian Graz, AT 6 10
Mathé, Jörg Graz, AT 5 9
Noda, Tetsushi Yokohama, JP 7 19
Reissig, Michael Graz, AT 7 13
Reiter, Bernd Kainbach bei Graz, AT 5 4
Shiomi, Takeshi Yokosuka, JP 62 291
Yaguchi, Tatsuya Yokohama, JP 49 428

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 25, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 25, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 25, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00