Flow sensor apparatus for monitoring a directed stream of an agricultural product

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11231305
APP PUB NO 20210199481A1
SERIAL NO

17201988

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow sensor apparatus for monitoring a directed stream of an agricultural product from an application port of a supply tube. The directed stream has a target directed portion and an off-target portion. A sensor housing includes a conical flow receiving element and a sensor body. The receiving element has an inlet orifice at a first end and a receiving element outlet at a second end. The first end is smaller than the second end. The sensor body has a sensor inlet end positioned to receive a target directed portion of the directed stream from the receiving element outlet of the conical flow receiving element wherein an off-target portion of the directed stream is not sensed. The sensor housing and sensor element are positioned external to the application port and thus positioned to provide measurement, targeting, and timing of the agricultural product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMVAC CHEMICAL CORPORATION4695 MACARTHUR COURT SUITE 1200 NEWPORT BEACH CA 92660

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Conrad, Larry M Walker, US 34 385
Rice, Richard L Collierville, US 34 211

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 25, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 25, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 25, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00