Integrated fuel nozzle connection

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11230976
APP PUB NO 20190017444A1
SERIAL NO

15649853

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas turbine includes a compressor, a turbine, and a combustor disposed downstream from the compressor and upstream from the turbine. The combustor includes an end cover. The combustor also includes a flange. The flange includes an internal fluid passage defined within the flange and the flange is coupled to an internal face of the end cover. A fuel port is integrally joined with the flange. The fuel port extends through the end cover between the flange and an inlet positioned outside of the end cover. The inlet of the fuel port is in fluid communication with the internal fluid passage of the flange.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON RD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Annamalai, Subramanian Greenville, US 19 208
Bobba, Mohan Krishna Simpsonville, US 11 31
Stoia, Lucas John Taylors, US 119 1209

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 25, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 25, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 25, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00