Method and device for heavy oil lightening and synthesis gas production

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11230677
APP PUB NO 20210087483A1
SERIAL NO

17028957

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for heavy oil lightening and synthesis gas production and a device thereof are provided, where the method uses a cracking/gasification coupled reactor, which internally has a cracking section and a gasification section that communicate with each other, and includes the following steps: feeding a heavy oil material into the cracking section to implement a cracking reaction, to produce a light oil gas and a coke; the coke being carried by the coke powders and descending into the gasification section to implement a gasification reaction, to produce a synthesis gas; at least performing a first stage gas-solid separation, collecting coke powder particles and dividing them into two parts; performing an oil and gas fractionation on a purified oil and gas product output by the gas-solid separation system, and collecting a light oil product and a synthesis gas product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA UNIVERSITY OF PETROLEUM-BEIJINGNO 18 FUXUE ROAD CHANGPING DISTRICT BEIJING 102249

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Jinsen Beijing, CN 22 86
Lan, Xingying Beijing, CN 6 3
Shi, Xiaogang Beijing, CN 4 2
Wang, Chengxiu Beijing, CN 5 2
Zhang, Yuming Beijing, CN 45 756

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 25, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 25, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 25, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00