Integrated method and apparatus for catalytic cracking of heavy oil and production of syngas

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11230674
APP PUB NO 20210087479A1
SERIAL NO

17028930

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides an integrated method and apparatus for catalytic cracking of heavy oil and production of syngas. A cracking-gasification coupled reactor having a cracking section and a gasification section is used as a reactor in the method. A heavy oil feedstock is fed into a cracking section to contact with a bed material in a fluidized state that contains a cracking catalyst, a catalytic cracking reaction is conducted under atmospheric pressure to obtain light oil-gas and coke. The coke is carried downward by the bed material into a gasification section to conduct a gasification reaction to generate syngas; the syngas goes upward into the cracking section to merge with the light oil-gas, and is guided out from the coupled reactor and enter a gas-solid separation system. Oil-gas fractionation is performed to a purified oil-gas product output from the gas-solid separation system to collect light oil and syngas products.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA UNIVERSITY OF PETROLEUM-BEIJINGNO 18 FUXUE ROAD CHANGPING DISTRICT BEIJING 102249

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Jinsen Beijing, CN 22 86
Lan, Xingying Beijing, CN 6 3
Wang, Chengxiu Beijing, CN 5 2
Zhang, Yuming Beijing, CN 45 756

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 25, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 25, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 25, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00