Extreme ultraviolet light generating system and electronic device manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11226565
APP PUB NO 20200363729A1
SERIAL NO

16987856

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An extreme ultraviolet light generating system includes a chamber; a target supply unit configured to successively output, toward a predetermined region in the chamber, a plurality of droplets including a first droplet and a second droplet of a target substance; a trajectory correcting laser apparatus configured to apply a trajectory correcting laser beam to each of the droplets moving from the target supply unit toward the predetermined region; a drive laser apparatus configured to apply a drive laser beam to each droplet having reached the predetermined region to generate plasma; and a control unit configured to control the trajectory correcting laser apparatus such that intensity of the trajectory correcting laser beam applied to the first droplet is different from intensity of the trajectory correcting laser beam applied to the second droplet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GIGAPHOTON INCTOCHIGI COUNTY JAPAN TOCHIGI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yanagida, Tatsuya Oyama, JP 54 674

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 18, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 18, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 18, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00