Chip-scale coherent lidar with integrated high power laser diode

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11226403
APP PUB NO 20190018139A1
SERIAL NO

15957974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chip-scale coherent lidar system includes a master oscillator integrated on a chip to simultaneously provide a signal for transmission and a local oscillator (LO) signal. The system also includes a beam steering device to direct an output signal obtained from the signal for transmission out of the system, and a combiner on the chip to combine the LO signal and a return signal resulting from a reflection of the output signal by a target. One or more photodetectors obtain a result of interference between the LO signal and the return signal to determine information about the target.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Efimov, Oleg Thousand Oaks, US 17 134
Patterson, Pamela R Los Angeles, US 38 609
Sarkissian, Raymond Studio City, US 22 104
Sayyah, Keyvan Santa Monica, US 61 1074

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 18, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 18, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 18, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00