Velocity damper for a recovery boiler

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11226095
APP PUB NO 20200240635A1
SERIAL NO

16747174

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided for controlling airflow into a furnace that employs a velocity type damper. In one embodiment, the method for controlling airflow may include engaging a velocity type damper to an air port opening of a furnace. The velocity type damper includes at least one air controlling surface that is positioned proximate to a wall of the furnace at the air port opening so that air velocity exiting the at least one air controlling surface is substantially equal to the air velocity entering the air port opening to the furnace. The method may further include adjusting a cross sectional area through the velocity type damper to control air velocity into the furnace through the air port opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANDRITZ INC5405 WINDWARD PARKWAY SUITE 100W ALPHARETTA GA 30004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Phillips, John Alpharetta, US 58 1401
Watson, David Alpharetta, US 107 1578

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 18, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 18, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 18, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00