Dry process connected energy-consuming beam column joint based on corbel

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11225786
APP PUB NO 20210214931A1
SERIAL NO

17030396

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dry process connected energy-consuming beam column joint based on a corbel includes a prefabricated concrete corbel column, pre-buried steel plates and connecting steel plates, wherein the corbel section of the prefabricated concrete corbel column is stepped, and a notch section of a prefabricated concrete notch beam is matched with the stepped section of the corbel and is in lap joint to the stepped section; the pre-buried steel plates are separately pre-buried on the upper and lower surfaces of the corbel and the prefabricated concrete notch beam, friction plates are arranged outside the pre-buried steel plates, and slight tooth spaces are arranged on the sides, facing the pre-buried steel plates, of the friction plates; and the connecting steel plates are arranged on the left and right sides of the prefabricated concrete notch beam and the corbel lap joint section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOUTHWEST JIAOTONG UNIVERSITY610031 NO TWO SECTION 111 RING ROAD CHENGDU SICHUAN CHINA CHENGDU CITY SICHUAN PROVINCE 610031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Wenjun Chengdu, CN 21 55
Guo, Liping Chengdu, CN 31 418
Guo, Rui Chengdu, CN 229 981
Jin, Yuntao Chengdu, CN 6 4
Liu, Chun Chengdu, CN 89 456
Luo, Liru Chengdu, CN 6 4
Xu, Hu Chengdu, CN 101 66
Yu, Zhixiang Chengdu, CN 12 23
Zhao, Lei Chengdu, CN 382 2549

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 18, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 18, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 18, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00