Railway truck assembly having I-beam components

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11225272
APP PUB NO 20200017127A1
SERIAL NO

16509658

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A truck assembly is configured to travel along a track having rails, and includes a first side frame, a second side frame, and a bolster extending between the first side frame and the second side frame. One or more of the first side frame, the second frame, or the bolster includes at least a portion formed as an I-beam that includes a web having a first end and a second end opposite from the first end, a first flange extending from the first end of the web, and a second flange extending from the second end of the web. A thickness of the web increases away from a first neutral axis towards the first flange and the second flange.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WELLS FARGO BANK NATIONAL ASSOCIATION AS SUCCESSOR AGENTMAC D1109-019 1525 WEST W T HARRIS BLVD CHARLOTTE NC 28262

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Monaco, Jay P Glen Carbon, US 8 159
Tonnies, Joshua E Damiansville, US 1 1
Wike, Paul Steven St. Louis, US 15 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 18, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 18, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 18, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00