High efficiency, high output transmission
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Jan 18, 2022
Grant Date -
Aug 26, 2021
app pub date -
May 7, 2021
filing date -
May 7, 2021
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A transmission includes an input shaft coupled to a prime mover, a countershaft, main shaft, and an output shaft, with gears between the countershaft and the main shaft. A shift actuator selectively couples the input shaft to the main shaft by rotatably coupling gears between the countershaft and the main shaft. The shift actuator is mounted on an exterior wall of a housing including the countershaft and the main shaft. An integrated actuator housing includes a single external power access for the shift actuator. A controller interprets a shaft displacement angle, determines if the transmission is in an imminent zero or zero torque region, and performs a transmission operation in response to the transmission in the imminent zero or zero torque region.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
EATON CUMMINS AUTOMATED TRANSMISSION TECHNOLOGIES LLC | 301 EAST MARKET STREET INDIANAPOLIS IN 46204 |
International Classification(s)

- 2021 Application Filing Year
- B60K Class
- 2345 Applications Filed
- 1419 Patents Issued To-Date
- 60.52 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Chimner, Christian | Royal Oak, US | 33 | 133 |
# of filed Patents : 33 Total Citations : 133 | |||
Connolly, Thomas | Portage, US | 43 | 365 |
# of filed Patents : 43 Total Citations : 365 | |||
Jackson, Graeme Andrew | Kalamazoo, US | 49 | 164 |
# of filed Patents : 49 Total Citations : 164 | |||
Peterson, Paul | Scotts, US | 67 | 793 |
# of filed Patents : 67 Total Citations : 793 | |||
Smith, Timothy Scott | Paw Paw, US | 33 | 120 |
# of filed Patents : 33 Total Citations : 120 | |||
Wadas, David L | Kalamazoo, US | 46 | 369 |
# of filed Patents : 46 Total Citations : 369 | |||
Wilson, Paul | Otsego, US | 109 | 1017 |
# of filed Patents : 109 Total Citations : 1017 | |||
Wota, Andrzej | Gdansk, PL | 22 | 97 |
# of filed Patents : 22 Total Citations : 97 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B60K Class
- 0 % this patent is cited more than
- 3 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Jul 18, 2025 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 18, 2029 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 18, 2033 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Sep 17, 2024 | P | Publication | |
Aug 28, 2024 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Aug 13, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Jul 22, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
Jul 09, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Apr 02, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Mar 24, 2022 | P | Published | |
Jan 10, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Oct 25, 2021 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KURISU, KEN;ISHII, KENTARO;TAKEUCHI, KAZUMA;SIGNING DATES FROM 20210514 TO 20210520;REEL/FRAME:057897/0582 Owner name: JFE STEEL CORPORATION, JAPAN |
Jul 23, 2021 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
Dec 26, 2019 | F | Filing | |
Jan 31, 2019 | PD | Priority Date |

Matter Detail

Renewals Detail
