Method of repairing a component using an additive manufacture replacement coupon, and alloy for additive manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11224915
APP PUB NO 20180345381A1
SERIAL NO

15970101

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a secondary component from an original component having an original shape includes separating the original component into a parent component and a replaced portion, and forming a replacement coupon using an additive manufacturing system. The replacement coupon is shaped to substantially match the original shape of the replaced portion. The method further includes coupling the replacement coupon to the parent component to form the secondary component. The method also includes at least one of (i) removing the replacement coupon from a build plate of the additive manufacturing system prior to application of any heat treatment to the as-built replacement coupon, wherein the replacement coupon maintains a near-net original shape of the replaced portion after removal, and (ii) entering the secondary component into normal duty with no hot isostatic press treatment of the replacement coupon having been performed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aleem, Mohamed Bangalore, IN 1 1
Balaram, Sridhar Bangalore, IN 2 1
Pal, Joydeep Bangalore, IN 6 20
Raghunandan, M Bangalore, IN 1 1
Sen, Rohit Bangalore, IN 1 1
Srinivasan, Dheepa Bangalore, IN 19 185

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 18, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 18, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 18, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00