Snapshot management architecture for process control operator training system lifecycle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11222551
APP PUB NO 20170025040A1
SERIAL NO

14987144

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cloud-based operator training system includes a snapshot management architecture, which provides a hybrid system for generation of control system level scenarios and system-state snapshots, and which can improve the fidelity of a training simulation. By implementing the simulation system on a cloud platform, the system can generate a large and growing set of snapshot files representing various control states and corresponding process states. These files can then be leverage during operator training sessions to yield high fidelity simulated system operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROCKWELL AUTOMATION TECHNOLOGIES INC1 ALLEN-BRADLEY DRIVE MAYFIELD HEIGHTS OH 44124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cahalane, Ryan Chagrin Falls, US 22 854
Cherpakov, Alexander B Mayfield Heights, US 6 66
Maturana, Francisco P Lyndhurst, US 75 1945
Siafakas, Bryan N Cleveland, US 2 33
Stump, Andrew R Mentor, US 99 626

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 11, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 11, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 11, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00