Devices, systems, and methods for providing and using one or more valves in an assembly line grow pod

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11219172
APP PUB NO 20180359966A1
SERIAL NO

15965280

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly line grow pod includes a plurality of fluid lines fluidly coupled between a fluid source and a fluid destination within the assembly line grow pod, a plurality of valves, each coupled to a fluid line such that fluid movement through the fluid lines is selectively controlled by the valves, and a master controller communicatively coupled to the valves. The master controller is programmed to receive information relating to fluid delivery within the assembly line grow pod, determine one or more valves to direct the fluid, determine valve parameters for each of the valves that achieve the fluid direction, and transmit one or more control signals to the valves for directing the fluid within the assembly line grow pod.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GROW SOLUTIONS TECH LLC170 S INTERSTATE PLAZA DRIVE LEHI UT 84043

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Millar, Gary Bret Highland, US 82 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 11, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 11, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 11, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00