Optical network converter module

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11218229
APP PUB NO 20200343979A1
SERIAL NO

16924833

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A converter module comprises a housing; a fiber optic connector integrated with the housing, wherein the fiber optic connector is configured to mount directly to a fiber optic connector in a service terminal; a single electrical connector configured to couple to a metallic medium; and an optical-to-electrical (O/E) converter located in the housing and coupled to the fiber optic connector and the single electrical connector, the O/E converter configured to convert between optical frames communicated via the fiber optic connector and electrical signals communicated via the metallic medium.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ARRIS ENTERPRISES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, David Suffolk, GB 466 9390
Erreygers, Jan Jozef Julia Maria Tielt-Winge, BE 22 149
Franckx, Joris Bonheiden, BE 12 396
Mather, David Cheshire, GB 14 95
Shaddock, Robert Neil Doylestown, US 8 19
Weeks, William Atley Ivyland, US 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 4, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 4, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 4, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00