Resin-platinum composite and usage thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11215611
APP PUB NO 20180209965A1
SERIAL NO

15743277

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This resin-platinum composite 100 is provided with resin particles 10 and platinum particles 20, and the platinum particles 20 are immobilized on the resin particles 10. In the resin-platinum composite 100, one portion of the platinum particles 20 may be distributed three-dimensionally on surface layer sections 60 of the resin particles 10. In this case, the one portion of the three-dimensionally distributed platinum particles 20 may be partially exposed outside the resin particles 10, and the remaining portion may be enclosed in the resin particles 10. In the platinum particles 20, enclosed particles 30 that are fully enclosed in the resin particles 10, partially exposed particles 40 each having a segment embedded inside the resin particles 10 and a segment exposed outside the resin particles 10, and surface attached particles 50 attached to the surfaces of the resin particles 10 preferably exist.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CHEMICAL & MATERIAL CO LTD13-1 NIHONBASHI 1-CHOME CHUO-KU TOKYO 1030027 ?1030027

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Enomoto, Yasushi Tokyo, JP 12 74
Matsumura, Yasufumi Tokyo, JP 14 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 4, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 4, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 4, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00