Engine device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11215146
APP PUB NO 20210363944A1
SERIAL NO

17234802

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When an execution condition for a purge of supplying evaporated fuel gas to an intake pipe is met, a required purge ratio is set within a range equal to or higher than a lower-limit purge ratio, and a purge control valve is controlled using a driving duty based on the required purge ratio. In this case, when the execution condition is continuously met, an ejector pressure is estimated based on a pressure difference between a supercharging pressure and a pre-compressor pressure, and on the driving duty, and the lower-limit purge ratio is set based on a post-throttle-valve pressure and on the ejector pressure. The value of the lower-limit purge ratio is set to zero immediately after the execution condition switches from being not met to being met.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goh, Reiko Toyota, JP 8 5
Idogawa, Masanao Nagoya, JP 89 248
Kachi, Masahiro Nagakute, JP 26 27
Uchida, Takahiro Okazaki, JP 66 426
Yamamoto, Hirokatsu Chita, JP 51 707

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 4, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 4, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 4, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00