Energy-saving double-motor double-station screw press

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11214029
APP PUB NO 20200189220A1
SERIAL NO

16799754

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a double-motor double-station screw press, comprising two sets of screw pair mechanisms on both sides thereof, i.e., first and second screw pair mechanisms, where in the first screw pair mechanism, a first lead screw is driven by a resultant movement synthesized by first and second motors through a first differential gear train; in the second screw pair mechanism, a second lead screw is driven by a resultant movement synthesized by the first and second motors through a second differential gear train; a first slider and a second slider in the press work symmetrically; a transmission mode between the second motor and the second differential gear train is switched by controlling a steering switching apparatus, such that the second motor can assist the first motor during a single-cylinder pressing process to increase the output pressure, but also it is convenient to adjust a relative positions of two cylinders.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEFEI UNIVERSITY OF TECHNOLOGYTUNXI ROAD IN BAOHE DISTRICT OF HEFEI CITY OF ANHUI PROVINCE NO 193 230009 HEFEI CITY ANHUI PROVINCE 230009

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Bo Hefei, CN 9 7
Huang, Haihong Hefei, CN 13 7
Jin, Rui Hefei, CN 23 72
Li, Lei Hefei, CN 645 4033
Liu, Zhifeng Hefei, CN 31 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 4, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 4, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 4, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00