Process for the multi-stage production of a traction or carrying means

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11214027
APP PUB NO 20190202152A1
SERIAL NO

16326734

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the production of a traction or carrying means built up from a plurality of components or assemblies of extruded elastomeric material, wherein, in a first substep, a first component, provided with reinforcing members or cables, of the traction or carrying means is produced and, in further substeps, a traction or carrying means, which is connected to further components or provided with further layers of elastomeric material, fabric layers or reinforcing-member layers, is successively completed, and optionally said traction or carrying means is shaped on one or more sides, wherein the individual substeps follow one another such that a component processed or completed in the respectively preceding substep is fed at room temperature (Rt), after a maximum of 1 to 10 minutes, to the subsequent substep, and such that the temperature of the component does not drop below 30° C. between a respectively preceding substep and the subsequent substep.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONTITECH DEUTSCHLAND GMBH30175 HANNOVER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goeser, Hubert Dannenberg, DE 10 64
Kucharczyk, Andre Guelden, DE 11 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 4, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 4, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 4, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00