Thyristor starter

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11211882
APP PUB NO 20210152104A1
SERIAL NO

16623905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thyristor starter accelerates a synchronous machine from a stop state to a predetermined rotation speed by sequentially performing a first mode of performing commutation of an inverter by intermittently setting DC output current of a converter to zero and a second mode of performing commutation of the inverter by induced voltage of the synchronous machine. In the thyristor starter, during a first time period from start of performance of the second mode to arrival of the induced voltage of the synchronous machine at a first voltage value, a phase control angle of the inverter is changed such that a value thereof becomes larger as a rotation speed of the synchronous machine becomes higher.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TMEIC CORPORATION1-1 KYOBASHI 3-CHOME CHUO-KU TOKYO 104-0031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ando, Akinobu Chuo-ku, JP 18 49
Kawaguchi, Hironori Chuo-ku, JP 6 2
Matsumoto, Yasuaki Chuo-ku, JP 30 85
Ogino, Hiroshi Chuo-ku, JP 99 641

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00