Method and apparatus to develop lithographically defined high aspect ratio interconnects

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11204555
APP PUB NO 20190204744A1
SERIAL NO

15857308

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus, comprising at least one vessel having a bottom and at least one sidewall extending from the bottom, wherein the at least one sidewall encloses an interior of the at least one vessel, a shaft has a proximal end and a distal end, wherein the distal end of the shaft extends into the interior of the at least one vessel, wherein the proximal end of the shaft is coupled to a motor, at least one support structure which extends laterally from the shaft; and a substrate attachment fixture on a distal end of the at least one support structure, wherein the at least one support structure and the substrate attachment fixture are within the interior of the at least one vessel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tadayon, Pooya Portland, US 90 313

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00