Reverse burn power charge for a wellbore tool

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11204224
APP PUB NO 20200378731A1
SERIAL NO

16886257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power charge and method for actuating a wellbore tool with a power charge. The power charge may include a first volume containing a first energetic material and a second volume containing a second energetic material positioned within the first energetic material. The second energetic material may be a faster burning material compared to the first energetic material. The wellbore tool may include a power charge cavity, an initiator positioned in an initiator holder adjacent to the power charge within the power charge cavity, and a gas diverter channel for directing to an expansion chamber gas pressure generated by combustion of the power charge, to actuate the wellbore tool. The method may include inserting the initiator into the intiator holder within the power charge cavity and initiating combustion of the first energetic material and the second energetic material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DYNAENERGETICS EUROPE GMBHKAISERSTRASSE 3 TROISDORF 53840

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McNelis, Liam Bonn, DE 74 1875

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00