Wheel for a vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11203227
APP PUB NO 20190111730A1
SERIAL NO

16091027

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wheel includes a rim that is at least partially made from a fiber reinforced plastic. The rim has an inner side extending to the hub region of the wheel and an outer side extending centrifugally away from the hub region of the wheel whereby the outer side includes a well which is interconnected with an outer shoulder by a transition area. A wheel center is interconnected with the inner side of the rim by at least one fastener wherein the at least one fastener penetrates the rim via at least one opening that extends from the inner side of the rim to the outer side of the rim. An annular cover is arranged at the outer side of the rim in a circumferential direction around the wheel and thereby covers the at least one fastener and/or the at least one opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MUBEA CARBO TECH GMBHEUGEN-MÜLLER-STRASSE 16 AT-5020 SALZBURG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Renner, Christoph Gosau, AT 49 246

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00