Method of manufacturing an oscillator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11201571
APP PUB NO 20190115853A1
SERIAL NO

16086163

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of manufacturing an oscillator, including: arranging an electrode on a piezoelectric ceramics free from being subjected to polarization treatment, to thereby provide a piezoelectric element; bonding the piezoelectric element and a diaphragm to each other at a temperature T1; bonding the piezoelectric element and a power supply member to each other at a temperature T2; and subjecting the piezoelectric ceramics to polarization treatment at a temperature T3, in which the temperature T1, the temperature T2, and the temperature T3 satisfy a relationship T1>T3 and a relationship T2>T3.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHATOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuta, Tatsuo Machida, JP 101 448
Hayashi, Jumpei Yokohama, JP 65 394
Koyama, Shinya Tokyo, JP 48 237
Kubota, Makoto Yokohama, JP 219 2960
Shimizu, Yasushi Fujisawa, JP 140 1901
Takeda, Kenichi Yokohama, JP 148 1821
Tanaka, Hidenori Tokyo, JP 119 556
Uebayashi, Akira Tokyo, JP 31 67
Ueda, Miki Tokyo, JP 45 244
Watanabe, Takayuki Yokohama, JP 316 3383

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00