Stator core including recessed portion, projecting portion, and welded portion, and motor including same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11201518
APP PUB NO 20200127522A1
SERIAL NO

16574203

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stator core includes plate-shaped core members laminated to define the stator core. Each core member includes an annular core back portion, and tooth portions that project radially inward from an inner circumferential surface of the core back portion. The core back portion includes at least one recessed portion recessed radially inward from an outer circumferential surface of the core back portion, and at least one welded portion arranged at a corresponding one of the at least one recessed portion to join axially adjacent ones of the core members. The at least one recessed portion is recessed in a radial direction is in a range of about 0.2 mm to about 1.5 mm, both inclusive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIDEC CORPORATION338 KUZETONOSHIRO-CHO MINAMI-KU KYOTO-SHI KYOTO 6018205 ?6018205

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukunaga, Keisuke Kyoto, JP 47 244

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00