Secondary battery having filling valve

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11201379
APP PUB NO 20180366718A1
SERIAL NO

15979978

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The secondary battery includes a body part provided in a pillar shape on an outer wall and including a passage, through which the electrolyte flows, therein, a pin switch extending in a longitudinal direction of the body part, wherein, when a pressure is applied to an end of the pin switch, the pin switch linearly moves toward the inside, and when the pressure is removed, the pin switch linearly moves toward the outside, a manipulation part to move in a direction that is parallel to the pin switch, a pressure apply part protruding from a central portion of the manipulation part to apply a pressure an end of the pin switch, and a switching part disposed on the other end of the pin switch to open and close the passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ENERGY SOLUTION LTDSEOUL 07335

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dae Soo Daejeon, KR 32 30
Kim, Dong Kyu Daejeon, KR 101 1009
Yoon, Jong Keon Daejeon, KR 28 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00