Method for producing a reinforced concrete part, and thus-produced part

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11199000
APP PUB NO 20110244211A1
SERIAL NO

13133555

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a reinforced concrete part, having a tensioned portion subjected to pull stresses and tending to stretch under the load, and which includes a reinforcing frame with at least one tensioned longitudinal bar rigidly connected to the concrete by an adhesive connection that determines a tangential adhesive stress along the bar that varies on the basis of applied pull stresses. Each tensioned longitudinal bar has, on at least one portion of the length thereof, a discontinuous series of spaced blocking areas that each include a plurality of elements for anchoring into the concrete and which are separated from each other by a series of sliding areas, in each of which an increase in the adhesion stress above a limit value causes the bar to disengage, without disrupting the concrete, on at least a portion of the length between the two blocking areas with an extension of the bar corresponding to applied pull stresses, the extension being distributed over the entire length of the disengaged portion of the bar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOCIETE CIVILE DE BREVETS MATIERE15000 AURILLAC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matiere, Marcel Aurillac, FR 19 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00