Apparatus for producing a fire special effect

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11198073
APP PUB NO 20190143238A1
SERIAL NO

16188984

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to an apparatus for use in producing a simulated flame/fire effect using steam or theatrical smoke. In one embodiment, the apparatus includes an first chamber for receiving steam or theatrical smoke, an annular second chamber that surrounds the first chamber and defines an annular closed-loop slot through which a closed-loop sheet of steam or theatrical smoke exits, a passageway for conveying smoke from the first chamber to the annular second chamber, a lighting structure for projecting light onto the steam or theatrical smoke exiting the annular slot, and an air modulator for modulating the position of the steam or theatrical smoke exiting the slot.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNIFEX PRODUCTS LLC25261 RYE CANYON ROAD VALENCIA CA 91355

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Case, Matthew A Sylmar, US 3 4
Hall, Rockne J Newhall, US 3 56
Lunde, Montgomery C Marina del Rey, US 12 31
Lunde, Ryan G Santa Clarita, US 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00