Power generation prediction system and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11196380
APP PUB NO 20200127598A1
SERIAL NO

16720349

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation prediction system using a first and second neural networks is provided, and the first neural network is connected to the second neural network. The first neural network receives first input data, and generates the amount prediction data according to the first input data. The first input data is used to determine amount prediction data, and the amount prediction data is used to determine power generation prediction data. The second neural network receives the amount prediction data, and calculates the power generation prediction data according to the amount prediction data. When a device in a selected area is deteriorated or reinstalled, the second neural network is fine-tuned and trained again. The power generation prediction data is a power generation prediction bound having a maximum and minimum power generation prediction values, and thus the power deployment terminal in a power grid can deploy power more precisely.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN POWER COMPANYNO 242 SEC 3 ROOSEVELT RD ZHONGZHENG DISTRICT TAIPEI CITY 100208

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Chih-Jung Taipei, TW 39 87
Chou, Li-Fen Taipei, TW 2 4
Leu, Yih-Guang Taipei, TW 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00