Data center with backup power system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11196291
APP PUB NO 20210066957A1
SERIAL NO

16613911

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is related to a hardware developed for allowing the virtualization of power and therefore bringing change to the data center market. This new concept, unique in the industry, offers the missing link to respond to the multiple and contradictory challenges the industry will be facing in managing power. The concept of a rack mounted power pack sized for average loads, is allowing peak shaving, and microgrid utilization. The combination of renewable power sources and grid connections enables cost savings while increasing the resilience of the overall infrastructure. The so-called “Power Fusion” operates like a decentralized double conversion UPS with all the advantages of centralized architecture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CE+T POWER LUXEMBOURG SA9911 TROISVIERGES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bleus, Paul Wandre, BE 11 54
Joannes, Thierry Flemalle, BE 7 32
Milstein, François Liege, BE 6 32
Rixhon, Daniel Awans, BE 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00