Connecting pole for a rechargeable battery and connecting pole and housing assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11196130
APP PUB NO 20190296318A1
SERIAL NO

16376056

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a connecting pole (1) for a rechargeable battery (12) having the following features: a) the connecting pole (1) has a connecting section (2), in which a pole terminal can be fastened on the connecting pole (1), b) the connecting pole (1) has a fastening section (3), in which the connecting pole (1) can be fastened in a housing part (5) of the rechargeable battery (12), c) the fastening section (3) has a labyrinth section (4), d) the outer wall (6) of the connecting pole (1) has, in the labyrinth section (4), one or more peripheral projections (7, 8, 10), e) at least two adjacently arranged peripheral projections (70, 71, 72, 73, 80, 81, 82, 83) are flanged in pairs in the mutually facing direction, wherein a recess (11) is formed on each of the peripheral projections (70, 71, 72, 73, 80, 81, 82, 83) with respect to the outer wall (6) of the connecting pole (1) by the flanged region. The invention also relates to a rechargeable battery housing or a part thereof with at least one such connecting pole and to a machine for producing such a connecting pole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CLARIOS GERMANY GMBH & CO. KG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ledoux, Anne-Laure Langenhagen, DE 10 17
Streuer, Peter Hannover, DE 32 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00