Linear stage efficiency techniques for H-bridge systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11194356
APP PUB NO 20200409400A1
SERIAL NO

16886451

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques for efficient operation of a linear stage in an H-bridge system are provided. In an example, a linear stage can switch between voltage regulation and current regulation over a range of a command signal. The particular regulation mode can depend on the regulation mode of a switched stage of the H-bridge system. Efficiency can be realized by using current regulation of the linear stage when the output voltage of the linear stage moves away from the voltage of a supply rail. Such a control scheme can reduce the voltage across the linear stage for a larger range of the command signal resulting in less heat dissipation of the linear stage compared to conventional control of H-bridge linear stages.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANALOG DEVICES INTERNATIONAL UNLIMITED COMPANYBAY F-1 RAHEEN INDUSTRIAL ESTATE LIMERICK V94 N4V2

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Yanfeng Shanghai, CN 12 72
Su, Xiaohua Hangzhou, CN 10 14
Sun, Fu Colorado Springs, US 4 3
Van, Duyne Stephen Todd Calhan, US 2 1
Wich, Mathew Todd Colorado Springs, US 5 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00