Fuel oxygen conversion unit with a fuel gas separator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11193671
APP PUB NO 20200141575A1
SERIAL NO

16179040

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel oxygen conversion unit includes a contactor defining a liquid fuel inlet, a stripping gas inlet and a fuel/gas mixture outlet; and a fuel gas separator defining a fuel/gas mixture inlet in flow communication with the fuel/gas mixture outlet of the contactor and an axis. The fuel gas separator further includes a stationary casing; and a separator assembly including a core and a plurality of paddles extending from the core, the separator assembly rotatable about the axis within the stationary casing to separate a fuel/gas mixture received through the fuel/gas mixture inlet into a liquid fuel flow and stripping gas flow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miller, Brandon Wayne Liberty Township, US 231 2428
Niergarth, Daniel Alan Norwood, US 104 1081
O'Connor, Ethan Patrick Hamilton, US 26 112
Wesling, Richard Alan Cincinnati, US 18 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00