Driving control device for fuel pump and fuel supply apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11193429
SERIAL NO

16950833

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A driving control device for a fuel pump may include a valve-opening-rate calculating unit and a driving control unit. The valve-opening-rate calculating unit may be configured to calculate an injector valve opening rate. The injector valve opening rate may be an injection time of an injector per unit time. The driving control unit may be configured to set a voltage duty ratio of a driving voltage that should be applied to the fuel pump that supplies fuel in a fuel tank to a fuel pipe communicating with the injector. The driving control unit may be further configured to set the voltage duty ratio to a value that is proportional to the injector valve opening rate calculated via the valve-opening-rate calculating unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAHLE INTERNATIONAL GMBHSTUTTGART GERMANY STUTTGART BADEN-WURTTEMBERG
MAHLE ELECTRIC DRIVES JAPAN CORPORATION3744 OAKU NUMAZU SHIZUOKA 410-0022

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sekita, Tomoaki Shizuoka, JP 10 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00