Construction system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11193287
APP PUB NO 20190242144A1
SERIAL NO

16317431

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for assembling a plurality of pre-fabricated components to form a structure comprising: a first lifting device for transporting at least one pre-fabricated component from a source to a designated site; a second lifting device for engaging the at least one pre-fabricated component at the designated site; wherein the second lifting device comprises an engagement means to engage a portion of the at least one pre-fabricated component for installation at the designated site, and wherein the engagement means is capable of moving the engaged pre-fabricated component in at least two degrees of motion, is disclosed. In some embodiments, the engagement means comprises a plurality of locks.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SH TECHNOLOGIES PTE LTD1 BUROH CRESCENT#07-01 COGENT 1 LOGISTICS HUB SINGAPORE 627545

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tan, Yeow Khoon Singapore, SG 4 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00