System and apparatus for print media manufacturing buffering and sorting, and corresponding method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11192729
SERIAL NO

17130581

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatuses, systems, and methods are described for providing a multiple process workflow. The system includes a first process device configured to convey at least a portion of a printed element and an apparatus. The apparatus includes a storage section, an input section configured to receive the at least a portion of the printed element, a gripper configured to selectively transport the at least a portion of the printed element from the input section to the storage section and to selectively transport the at least a portion of the printed element from the storage section, and an output section configured to selectively transfer the at least a portion of the printed element from the storage section. The system further includes a second process device configured to perform at least one operation on the at least a portion of the printed element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIGHTNING SOURCE LLC1246 HEIL QUAKER BOULEVARD LAVERGNE TN 37086

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kubiak, Peter Rosenheim, DE 8 5
Strasser, Josef Martin Staudach-Egerndach, DE 8 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00