System and method for modulating high power in a submersible energy storage vessel utilizing high voltage DC transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11183846
APP PUB NO 20190199094A1
SERIAL NO

15853086

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes multiple hybrid energy storage modules (HESMs) configured to accept constant-current DC input power from a main power source. Each HESM has a plurality of outputs configured to sequentially or simultaneously provide both constant-current and constant-voltage output power to multiple loads, the loads comprising steady state, pulsating, or intermittent loads. Each HESM comprises a combined rotating electrical machine-inertial storage module and electro-chemical storage module configured to generate second power that augments or induces first power derived from the main power source, so as to permit constant power draw or constant current draw from the main power source, wherein the output power comprises the first power and the second power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAYTHEON COMPANY870 WINTER STREET WALTHAM MA 02451-1449

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuznetsov, Stephen Marlborough, US 14 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00