Changeable frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11178984
APP PUB NO 20200163472A1
SERIAL NO

16611697

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A changeable frame allows exhibits presented therein to be exchanged in a simplified manner. The frame includes a frame element surrounding a frame opening in which the exhibit is visible from an observer side. A recess in the frame element leads from a lateral outer surface to an opposite inner surface of the frame element and opens into the frame opening for insertion of the exhibit into and removal of the exhibit from the frame opening. A drawer slidably mounted in the recess has a receptacle for positioning the exhibit. The drawer is slidable between an insertion position, in which the exhibit is visible in the frame opening, and a removal position, in which the receptacle of the drawer is outside of the frame element for the removal of the exhibit from the receptacle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DERNDINGER KATRIN40489 DÜSSELDORF

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Derndinger, Katrin Duesseldorf, DE 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00