Method for manufacturing solar cell, solar cell, and solar cell module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11177407
APP PUB NO 20200220037A1
SERIAL NO

16821572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a back electrode type solar cell, may include forming by physical vapor deposition at least one layer of an electrode material film on both a first conductivity type semiconductor layer, to give a first electrode layer, and a second conductivity type semiconductor layer, to give a second electrode layer, and patterning the first electrode layer and the second electrode layer each in a strip-like shape such that the first electrode layer and the second electrode layer both extend in a first direction and are arranged in a second direction by removing a part of the electrode material film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANEKA CORPORATIONOSAKA JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Irie, Tooru Osaka, JP 3 16
Yoshida, Wataru Osaka, JP 31 204
Yoshikawa, Kunta Osaka, JP 37 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00