Burner assembly, combustor, and gas turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11175043
APP PUB NO 20190086089A1
SERIAL NO

16082448

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A burner assembly for a combustor includes: a plurality of first nozzles arranged in a circumferential direction of the combustor; a plurality of first burner cylinders accommodating the respective first nozzles; and a middle-flow-passage forming portion which is connected to a downstream end of the plurality of first burner cylinders and which forms a middle flow passage through which a combustion chamber of the combustor is in communication with an interior space of each of the plurality of first burner cylinders. The middle-flow-passage forming portion includes an inner peripheral wall disposed on a radially inner side of the combustor and formed such that a distance from a center axis of the combustor to the inner peripheral wall is uneven with respect to the circumferential direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akamatsu, Shinji Kanagawa, JP 52 355
Saito, Keijiro Tokyo, JP 41 223
Takiguchi, Satoshi Tokyo, JP 43 193
Tanimura, Satoshi Kanagawa, JP 62 723

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00