Method for storing energy and for dispensing energy into an energy supply grid, pressurized gas storage power plant and computer program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11174785
APP PUB NO 20190178162A1
SERIAL NO

16324718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for storing energy and for dispensing energy into an energy supply grid by means of a pressurized gas storage power plant, which has at least one first storage chamber and at least one second storage chamber separate from the first, wherein in order to store energy pressurized gas is taken from the lower-pressure storage chamber, is compressed by means of a compression machine and the compressed pressurized gas exiting the compression machine is routed into the other storage chamber; in order to dispense energy pressurized gas is taken from the higher-pressure storage chamber, is routed through an expansion machine and the expanded pressurized gas exiting the expansion machine is transferred into the other storage chamber, wherein the expansion machine dispenses energy to the energy supply grid, wherein the pressurized gas is heated by means of a heating device prior to or upon supply to the expansion machine. The invention also relates to a corresponding pressurized gas storage power plant and to a computer program for carrying out the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ERNEO ENERGIESPEICHERSYSTEME GMBHOSTENMEER 1 WUNSTORF 31515

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Littmann, Wolfgang Wunstorf, DE 7 190

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00