Top-loading rear-dumping slide trailer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11173824
SERIAL NO

16510505

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transportable, top-loadable, and rear-unloadable slide trailer includes a frame, a secondary wheeled frame configured to translate relative to the frame between a forward position and a rearward position via a slideable assembly between the frame and the secondary wheeled frame, a bulk material carrier positionable in a load position and an unload position, and an unloader assembly coupled to the bulk material carrier and the frame. The trailer is loadable with the bulk material carrier in the load position. The trailer is transportable with the secondary wheeled frame in the rearward position and the bulk material carrier in the load position. The trailer is unloadable with the bulk material carrier in the unload position and the secondary wheeled frame in the forward position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HASTINGS THOMAS MOMAHA NE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hastings, Thomas M Omaha, US 5 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00