Transport device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11169490
SERIAL NO

16507090

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stacker crane includes a transporter, a slide fork, first to third sensors, a counter, and a main controller. The transporter moves from a shelf on which an article is supported to an empty shelf. The slide fork is mounted on the lift stage and transfers the article to and from the shelf. The first, second and third sensors recognize an abnormality of the article moved by the movement of the transporter. The counter counts the number of event occurrences. When an abnormality is recognized by the sensor, the main controller reduces a moving speed of the transporter, and when no abnormality is recognized by the sensor upon reduction in the moving speed, the movement of the transporter is continued. When the number of event occurrences reaches a first threshold, the stacker crane is brought into an abnormal-stop state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MACHINERY LTD3 MINAMI OCHIAI-CHO KISSHOIN MINAMI-KU KYOTO-SHI KYOTO 601-8326

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ueba, Hiroyuki Inuyama, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 9, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 9, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 9, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00