Localising sensor data collected during additive manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11167497
APP PUB NO 20190283332A1
SERIAL NO

16341246

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of monitoring an additive manufacturing process, in which an object is built in a layer-by-layer manner by directing a laser beam using at least one movable guiding element of a scanner to solidify selected regions of a material bed. The method includes recording position values generated from a transducer measuring positions of the at least one movable guiding element, recording sensor values generated from a sensor for detecting radiation emitted from the material bed and transmitted to the sensor by the movable guiding element of the scanner, and associating each sensor value with a corresponding one of the position values.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENISHAW PLCNEW MILLS WOTTON-UNDER-EDGE GLOUCESTERSHIRE GL12 8JR

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Ceri Plaisance-du-Touch, FR 27 318
Dardis, John Stroud, GB 7 19
Norman, Allan Christopher Stroud, GB 1 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 9, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 9, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 9, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00