Terminal connection structure, battery stack body, and method for forming terminal connection structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11158911
APP PUB NO 20190288264A1
SERIAL NO

16301656

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A terminal connection structure includes: an output terminal protruding from a surface of an exterior can of a battery and having an inclined surface, in a state that battery and a connection object are aligned, the inclined surface being inclined so as to be away from or close to the surface toward the connection object; and a bus bar having connection surface parallel to the inclined surface on one end side, surface contact between the connection surface and the inclined surface causing the one end side to be electrically connected to the output terminal, another end side being electrically connected to the connection object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD1-61 SHIROMI 2-CHOME CHUO-KU OSAKA-SHI OSAKA 540-6207

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Goro Osaka, JP 128 803

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00