Battery busbar

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11158910
APP PUB NO 20190173072A1
SERIAL NO

16162688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure provides a battery busbar including a conductive sheet, at least two bridge portions and at least two terminal contact portions. The conductive sheet has at least one cavity portion. Each of the at least two bridge portions has a first end and a second end which are opposite to each other, and the first ends of the bridge portions are respectively connected to different sides of the at least one cavity portion. The terminal contact portions are spaced apart from each other and are respectively connected to the second ends of the bridge portions. A width direction is defined to be substantially perpendicular to a line passing through the first end and the second end of one of the at least two bridge portions; along the width direction, a width of the bridge portion is smaller than a width of the terminal contact portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDUSTRIAL TECHNOLOGY RESEARCH INSTITUTENO 195 SEC 4 CHUNG-HSING ROAD CHU-TUNG HSIN-CHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chih-Ting New Taipei, TW 15 97
Sun, Chein-Chung Kaohsiung, TW 16 210

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00