Power distribution network monitoring system for detecting abnormalities

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11156641
SERIAL NO

16481120

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power distribution network monitoring system includes a CT sensor and a power management device. The CT sensor includes a measurement component and a transmitter. The measurement component is installed at a plurality of predetermined positions along a power line constituting the power distribution network, and measures current of the power line at each predetermined position. The transmitter wirelessly transmits, as transmission data, the power spectrums of the fundamental wave, third harmonic, and fifth harmonic, as well as the effective current values used to detect abnormalities in the power distribution network, the data being at least part of the data measured by the measurement components. The power management device includes a receiver and a management database. The receiver receives the transmission data. The management database stores the received data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OMRON CORPORATION801 MINAMIFUDODO-CHO HORIKAWAHIGASHIIRU SHIOKOJI-DORI SHIMOGYO-KU KYOTO-SHI KYOTO 600-8530

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adachi, Tatsuya Ichinomiya, JP 75 932
Takeya, Hiroaki Aichi, JP 8 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00