Method for preparing a two-component article and article obtainable by the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11155010
APP PUB NO 20190039271A1
SERIAL NO

16073877

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for preparing an article includes at least a first component of a polyolefin in conjunction with a second component of a polymer made by ring-opening metathesis polymerisation of norbornene type monomers. The method includes pre-treating a surface of the first component, applying a ring-opening metathesis polymerisable mixture of norbornene type monomers and a catalyst to the surface, and curing the ring-opening metathesis polymerisable mixture in contact with the surface, wherein the ring-opening metathesis polymerisable mixture has a η1000 at 30° C. of more than 9 sec. Articles such as a pipe line field joint or a protective element for a concrete tunnel lining element can be made using the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELENE SASBONDUES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marquette, Reynald Lens, FR 1 0
Recher, Gilles Marcq-en-Baroeul, FR 22 198

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00