Connector device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11153974
APP PUB NO 20200315027A1
SERIAL NO

16818071

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector device that includes a circuit board; a connector attached to the circuit board; a plurality of collars for external attachment; a first molded resin that is made of a first resin material whose melting point or softening point is 230° C. or less, and covers the entire circuit board and part of the connector; and a second molded resin that is welded to the first molded resin, is made of a second resin material whose melting point or softening point is higher than that of the first resin material for the first molded resin, and covers outer circumferences of the collars.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO WIRING SYSTEMS LTDJAPAN'S MIE CITY WEST END WIDE YOKKAICHI TOWN 1 TIME 14
SUMITOMO ELECTRIC INDUSTRIES LTDOSAKA JAPAN
AUTONETWORKS TECHNOLOGIES LTDMIE JAPAN MIE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirabayashi, Tatsuo Yokkaichi, JP 25 77
Kato, Masayuki Yokkaichi, JP 212 2891
Kawashima, Naomichi Yokkaichi, JP 20 25
Matsuoka, Akihiko Yokkaichi, JP 195 3336
Muronoi, Yu Yokkaichi, JP 6 10
Uchino, Takeo Yokkaichi, JP 17 595

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00