High strength austenitic stainless steel having excellent resistance to hydrogen embrittlement, method for manufacturing the same, and hydrogen equipment used for high-pressure hydrogen gas and liquid hydrogen environment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11149324
APP PUB NO 20160281187A1
SERIAL NO

15078562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This high strength austenitic stainless steel having excellent resistance to hydrogen embrittlement includes, in terms of mass %, C: 0.2% or less, Si: 0.2% to 1.5%, Mn: 0.5% to 2.5%, P: 0.06% or less, S: 0.008% or less, Ni: 10.0% to 20.0%, Cr: 16.0% to 25.0%, Mo: 3.5% or less, Cu: 3.5% or less, N: 0.01% to 0.50%; and O: 0.015% or less, with the balance being Fe and unavoidable impurities, in which an average size of precipitates is 100 nm or less and an amount of the precipitates is 0.001% to 1.0% in terms of mass %.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL STAINLESS STEEL CORPORATION8-2 MARUNOUCHI 1-CHOME CHIYODA-KU TOKYO 100-0005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatano, Masaharu Hikari, JP 56 259
Matsumoto, Kazuhisa Hikari, JP 38 420

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00